Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Premier Pitches

Reconstruction of stadium pitch

Bristol City Football Club, Ashton Gate Stadium

Introduction

A new stadium pitch for the Robins and the Bears

Having previously worked for the Bristol Sport Group on the construction of the Robins High Performance Centre and Bristol Bears Training Ground, MJ Abbott secured the project through direct negotiation with Ashton Gate Stadium Ltd.

The project was designed and monitored by PSD (Professional Sportsturf Design).

Project challenges

Services and foundations

The biggest challenge was finding and negotiating the existing services and old stadium foundations.

Contracts Director, Nathan George, explains: “All credit to our site staff, who had to adapt our programme and working methods based on what was found that day. This included negotiating unknown services, old concrete foundations and amending retained drainage and undersoil heating pipework.”

Our approach

An extensive pitch re-construction with the HERO hybrid mat system

The following scope of work was carried out:

  • Removal of existing pitch surface and repair of existing retained infrastructure
  • Installation of post sockets, extension of undersoil heating system and new irrigation complete with pump station
  • Installation of lower sand and upper rootzone
  • Installation of nutrient retentive amendments and fertilisers
  • Installation of HERO hybrid mat system
  • Installation of 3G synthetic pitch perimeter.

Following successful completion, Head Groundsman Dan Sparks grew in and maintained the pitch in match condition until first usage.

Charles Henderson of PSD made regular monitoring visits during construction and provided ongoing agronomic support during the grow-in.