Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Premier Pitches

Construction of SISGrass stitched hybrid turf stadium pitch

Chelsea Football Club, Stamford Bridge Stadium

Introduction

The iconic Stamford Bridge stadium

The iconic Stamford Bridge stadium in west London with high stands and overhanging roof is an amazing venue for football players and spectators. Expectations of excellence run through all aspects of the club and the stadium pitch is no exception. In early 2020 the decision was made to rebuild the pitch at the end of the 2019/20 season. The project was postponed in 2020 due to COVID-19 and work began in May 2021.

The club employed Charles Henderson of PSD to advise on the project as Turf Grass Consultant.

Following the success of delivering 9 No SISGrass hybrid pitches to date at the club’s Cobham training facility, the club employed MJ Abbott and industry partners Premier Pitches to carry out the reconstruction project.

Project challenges

A densely populated area of London

The stadium is in a very populated and heavily trafficked area of London. This presented challenges with maintaining good working relationships with local residents and adhering strictly to local planning restrictions.

The access around the stadium is one way and relatively tight, which required a very strict traffic management plan to ensure smooth interaction between artic lorries, stadium visitors, fans, hotel guests and club employees.

Trusted suppliers and hauliers were employed to maintain a very tight construction window and adhere to local restrictions. They are so important to delivering a successful project.

Our approach

An extensive pitch re-construction

The scope of work comprised the following:

  • Excavate to remove 200mm depth from the entire surface of the existing pitch, load onto lorries and remove from site for processing and re-use
  • Trim existing lower sand profile to designed pitch levels, ensuring the new finished levels consider the requirements of TV and spectators alike
  • Replace irrigation where appropriate and make repairs to the undersoil heating system
  • Supply and install new 100mm depth of lower sand rootzone and 100mm depth upper rootzone
  • Amelioration of nutrient retaining amendments
  • Cultivation, fertiliser applications, seeding and synthetic run-off works carried out by our partners Premier Pitches
  • Installation of SISGrass stitched hybrid pitch reinforcement system
  • First year’s renovation carried out in 2022 carried out by Premier Pitches Ltd.

Outcomes

A successful re-construction that plays as expected

The pitch was successfully grown in by head groundsman Jason Griffin and his grounds team, who continued to maintain a high standard during the first season’s use.

The pitch played as expected during its first season, reacting well to intense use at times, across all club competitions and training sessions.