Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Premier Pitches

Construction of SISGrass stitched hybrid turf training pitches

Hull City Football Club, Training Ground

Project summary

New training pitches at Cottingham

Premier Pitches secured the second phase of training ground works following successful completion of fibre sand pitch works carried out in 2014.

The project involved the construction of a hybrid training pitch to replace the existing fibre sand surface, construction of a new hybrid pitch plateau, and construction of a new fibre sand goalkeeping area.

The scope of works comprised:

  • Cut and fill earthworks to regrade the existing plateau over 3.5 pitches
  • Installation of new drainage, irrigation and undersoil heating systems
  • Import and spread new gravel drainage raft, lower sand profile and upper rootzone layer
  • Preparation and seeding of pitch surface, including installation of amendments and fertilisers
  • Installation of SISGrass hybrid pitch reinforcement system
  • Installation of new boundary fences and ball stop fencing.

The works were carried out during the close season in summer 2015.